Ptolemaida V
GREECE PTOLEMAIDA

Ptolemaida V

  • CATEGORYInfrastructure
  • DEVELOPED YEAR2018
  • DEVELOPED BYTERNA SA

This huge project concerns the construction of the fifth coal-fired unit at the Ptolemaida power station renewing the installed plants. The new lignite plant of Greek Public Power Corporation (PPC) will produce 660 megawatts with much lower environmental footprint. The total budget for the construction of the plant is €1,32 billion.

PROJECT PRODUCTS
GEONFLEX double structured wall conduit

GEONFLEX ISRDouble structured wall pipe with color identity

Ν750CLASS
NormalIMPACT RESISTANCE
750 NtRESISTANCE TO COMPRESSION
VIEW
GEODRAIN double structured wall perforated pliable conduits
CONDUR rigid conduit

CONDUR ISRHeavy type rigid conduit

44411CLASS
6JIMPACT RESISTANCE
1250 NtRESISTANCE TO COMPRESSION
VIEW
CONFLEX pliable conduit

CONFLEX ISRCorrugated heavy type pliable conduit

44412CLASS
6JIMPACT RESISTANCE
1250 NtRESISTANCE TO COMPRESSION
VIEW
GEOSUB double structured wall pliable conduit

GEOSUB ISRDouble structured wall pipe with color identity

N450CLASS
NormalIMPACT RESISTANCE
450 NtRESISTANCE TO COMPRESSION
VIEW