GREECE › THESSALONIKI
Thessaloniki Underground Railway
- CATEGORYInfrastructure
- DEVELOPED YEAR2018
- DEVELOPED BYAKTOR SA
The project includes the construction of 9,5 kilometers of line with two independent single-track tunnels, 13 modern platform stations and should be completed by 2020. There will be 18 driver-less trains and the stations will be equipped with platform screen doors
PROJECT PRODUCTS
GEOSUB ISRDouble structured wall pipe with color identity
N450CLASS
NormalIMPACT RESISTANCE
450 NtRESISTANCE TO COMPRESSION