Thessaloniki Underground Railway
GREECE THESSALONIKI

Thessaloniki Underground Railway

  • CATEGORYInfrastructure
  • DEVELOPED YEAR2018
  • DEVELOPED BYAKTOR SA

The project includes the construction of 9,5 kilometers of line with two independent single-track tunnels, 13 modern platform stations and should be completed by 2020. There will be 18 driver-less trains and the stations will be equipped with platform screen doors

PROJECT PRODUCTS
GEODRAIN double structured wall perforated pliable conduits
GEOSUB double structured wall pliable conduit

GEOSUB ISRDouble structured wall pipe with color identity

N450CLASS
NormalIMPACT RESISTANCE
450 NtRESISTANCE TO COMPRESSION
VIEW