Demir Kapija-Smokvic
SKOPJE DEMIR KAPIJA

Demir Kapija-Smokvic

  • CATEGORYInfrastructure
  • DEVELOPED YEAR2017
  • DEVELOPED BYAKTOR SA

The project consists of 28,2 kilometers of motorway, with 2 lanes in each direction and emergency lane from Demir Kapija to Smokvica as a part of the Pan – European Corridor X. The motorway includes 12 overpasses and underpasses, 2 twin-tube tunnels and 6 bridges.

PROJECT PRODUCTS
CONDUR rigid conduit
CONFLEX pliable conduit